This summer the Verona R-VII school district saw the construction of the high school lab and library building. The existing structure was completely stripped of all its internal components and redesigned to make better usages of the existing space. Both the labs and the library are larger and able to accommodate more students. As of today the build project is in its last stages of completion. The library is expected to open full by next week followed shortly by the computers labs. The library has a new very open design and the labs are getting new computers and other technology. The computers will be the newest and latest providing the best speed and software. A special thanks to tech and library staff and their families for all the time they donated over the summer break to help ensure this project had the highest level of success for the Verona R-VII school district.
New Labs and Library
July 18, 2018